问HN:为什么我们不能让已批准的建筑计划可重复使用?

1作者: silexia大约 1 个月前原帖
为什么我们每建造一座建筑都必须经历完整的建筑图纸和工程流程?也许我们需要进行土壤测试,以确保地基具有相同的承载能力。如果建筑方案获得政府官员的批准,那么该方案应该在批准列表上供任何人随时使用。每次想要建造一个已经获得批准并且实际上建造过数十万次的盒子时,花费2万或3万美元是非常愚蠢的。<p>建筑和工程的特殊利益集团在这方面确实控制了监管机构。
查看原文
Why do people have to go through an entire architectural drawing and engineering process for every single building we create? Maybe we would require a soils test to make sure the ground has the same bearing capacity. If a building plan is approved by government officials, that plan should be available on the approved list for anybody to use at any time going forward. It is stupid that people have to spend $20,000 or $30,000 every time they want to build a box that has been approved and built literally hundreds of thousands of times before.<p>The architectural and engineering special interests have really captured their regulators on this one.